Project summary

APEM was contracted to conduct environmental aspects of pre-decommissioning surveys for a major oil and gas field, located 140 km off the Scottish coast. The operator required detailed environmental and subsea surveys to prepare for the safe and efficient decommissioning of the platform and its associated wells and infrastructure. The surveys were part of one of the largest and most complex pre-decommissioning programmes undertaken in the North Sea.

Project context

The platform, installed in the late 1970s, had been a hub for oil and gas production from multiple fields. As part of the decommissioning process, APEM conducted a comprehensive survey program to map subsea infrastructure, assess environmental conditions, and ensure compliance with regulatory standards.

Key stats:

  • 26 days of continuous survey work.
  • 211 sampling stations for environmental ground truthing.
  • Over 2,000 minutes of video footage and 1,500 still images analysed.
  • 473 benthic samples and 223 physicochemical samples processed.
  • 10 comprehensive reports produced.

Project challenges

The survey covered a vast and remote area, requiring meticulous planning and execution. APEM’s team of environmental scientists worked around the clock to complete the surveys within tight deadlines, ensuring minimal disruption to the marine environment.

A critical aspect of the project was the requirement to process a vast number of samples within tight timescales while maintaining high-quality standards. Sample analysis is often a bottleneck in decommissioning projects, but APEM’s ability to analyse large numbers of samples quickly to those high standards kept the project on track and minimised delays. This efficiency ensured that even with the high volume of samples, the quality of analysis was never compromised, demonstrating APEM’s commitment to excellence and reliability.

20190927 064402 resized scaled

jonathan gong EqFU9IjTBQQ unsplash

APEM Group solution

APEM conducted detailed inspections and sampling to characterise habitats and assess contamination levels across the survey area and within drill cuttings piles. Systems for precise sampling and real-time habitat assessment were implemented to address potential environmental impacts and ensure the safety of the survey team. ROV footage was obtained across the survey area to identify habitats and potential Annex I habitats, Priority Marine Features, or other features of interest. Sampling was conducted using double van Veen grabs, 1 m ROV push cores, and 6 m vibrocorer to determine biological, physical, and chemical conditions. Reference stations were also sampled to compare conditions in the wider North Sea.

Following analysis of the samples within short timescales, APEM produced 10 comprehensive reports, including a Habitat Assessment Report, eight environmental baseline reports, and a drill cuttings piles report. Data were compared against other studies, threshold criteria set by OSPAR and NOREG, and other industry standards.

Additional support

APEM provided ongoing technical advice and support to the operator, helping to refine survey scopes and reduce costs. The high-quality data collected was instrumental in informing the decommissioning strategy and ensuring regulatory compliance.

Contact us

Fill out the below form to receive marketing content related to this case study.

Related Case Studies

Wide shot of the existing bridge with regeneration works in progress, highlighting the dock’s aquatic environment

Ecological Surveys Support Bridge Redevelopment at Dockside Canada Water

APEM Ltd., part of APEM Group, was commissioned by Assystem Energy (on behalf of Gardiner & Theobald LLP) to assess...

Read More
Australian offshore wind development evidence graphic with seaplane and coastal landscape.

APEM Group Drives Innovation in Offshore Wind Environmental Surveys for Gippsland Skies Australia

APEM Group was contracted by Gippsland Skies to deliver bird, marine mammal and megafauna aerial and boat-based baseline surveys for...

Read More
Rampion Offshore Wind Farm Ailish Cobban

Guiding Rampion 2 Offshore Wind Farm Through Complexity to Consent

APEM Group, through its specialist consultancy GoBe Consultants, played a pivotal role in securing development consent for the Rampion 2...

Read More